Early Complications
Clip: Episode 5 | 3m 5s | Video has closed captioning.
After draining out the quarry’s water, the Ice World team discovers the quarry’s floor structure is not as stable as what was anticipated. As a result, the engineering team must go back to the drawing board to rethink the design of the building.
Aired: 10/13/21
Buy Now:
Problems Playing Video? | Closed Captioning